XI. Recommendations (Part 2)
ADDITIONAL CONSIDERATIONS
Transition Plan
This section describes the major elements of a transition plan from use of TCP to use of TP-4 in DOD systems. The plan will vary depending on the option chosen. Both Option 1 and Option 2 share a number of common elements that are discussed first, including development of a MIL-SPEC, protocol-testing facilities, and transition support equipment. If Option 2 is followed, a demonstration of TP-4 must also be undertaken.
MIL-SPEC. As noted in recommendation 1, several open areas and options in the ISO TP-4 must be specified in order to have complete and compatible protocol implementations. Completion of this specification by the DOD should be a top priority objective.
Protocol-Testing Facilities. As noted in recommendation 3, test facilities for protocol implementations are essential. Under Option 1, this facility should serve primarily to validate implementations of both old and new protocol sets. If Option 2 is followed, the facility should initially focus on demonstrating the suitability of the new protocols for use in a military environment as rapidly as possible, and provide for testing of commercially supplied protocol implementations.
For validation purposes, the NBS protocol-testing facility developed for ISO protocols should serve as a good basis, but extensions to deal with any DOD-specific options for the ISO protocols, performance, and DOD protocols would be necessary. The DOD has stated that such a program has been started.
Transition Support Equipment. In any transition plan it must be assumed that the large body of systems with existing TCP implementations will take a substantial period of time to switch completely to the use of the ISO protocols. Some networks will include many different communities sharing a common communications backbone. Members of one community communicate primarily among themselves, but occasionally outside their community. While members of one community are likely to change over as a group, different communities will change to use the new protocols at different times.
Hence an interim period must be anticipated when some systems are using the old protocols and others, the new protocols. The transition plan must provide some means of allowing interaction between old and new systems where required during this period. Toward this end, a number of relay hosts may need to be developed that support both old and new protocols. These will allow automatic-staged forwarding of electronic mail between old and new systems and manually set up file transfer or remote terminal access via the relays. Performance through these relays will not be as good as with direct connections, but the relays should provide an adequate level of service for occasional interactions among different communities of the internet system.
When more frequent interaction is anticipated and better service is needed, major service hosts should support both old and new protocol sets concurrently so they can provide service directly without requiring the use of relays. Such service hosts include widely used time-sharing machines, file servers, and special servers such as Network Information Centers, Network Operations Centers, and Administrator Machines (providing mailboxes of network administrators, for example). Some dual protocol servers may also act as relays where the load of both functions can be supported.
Terminal concentrators for general use must also support both protocol sets so that connections to both old and new hosts can be made directly.
Gateways must support both old and new IPs so hosts using either one may send internet traffic. This requirement could be relaxed in the case of entire networks that will switch over simultaneously and hence will only need one type of IP traffic. Gateways should not have to translate between old and new IPs--it will be assumed that both source and destination hosts are using the same protocols or going through an explicit relay intermediate host.
This latter point requires some elaboration. If one type of IP packet arrives at a destination host or gateway that only handles the other type, it must be discarded. It would be good if, in addition, a suitable ICMP error packet could be returned in the unsupported protocol so it would be meaningful to the source. To avoid this situation the internet-host name table maintained by the Network Information Center should indicate which protocol(s) each host supports. Then when a source host looks up the address of a destination, it will also determine which type protocol to use or if a relay is required.
Demonstration Plan
If Option 2 is followed, a major demonstration of the ISO protocols in a military environment must be undertaken. Any such demonstration should proceed by stages beginning with the implementation of TP-4 in one network (15). Then the demonstration would be extended to include internetting (still with DOD IP) to validate the suitability of TP-4 as a replacement for TCP. The demonstration would then be further extended to employ the ISO IP in place of DOD IP.
Stand-Alone TP-4 Network Demonstration. The first stage of any transition plan must be to establish a demonstration network or subnetwork using TP-4 in place of TCP under existing higher-level protocols. This step will require selection of a suitable network (or subnetwork), procurement of TP-4 implementations for hosts and terminal access controllers on that network, and modification of higher-level protocols to use TP-4. The demonstration should include sufficient use of real applications to test the protocols in an operational environment.
To limit the amount of change attempted at one time, the DOD IP may be retained and used under TP-4. Alternatively, if ISO IP development status seems to warrant it, ISO IP may be installed along with TP-4. In the latter case, all TP-4 hosts would be on the same network anyway, so that IP will only be used between hosts and no gateways will be involved and no gateway modifications will be needed.
The hosts involved could be dedicated to the demonstration and hence only support TP-4 and only be able to interact with other demonstration network hosts or be concurrently supporting TCP and DOD IP for operational traffic to other "normal" hosts. In the latter case, no forwarding or relaying of traffic by hosts between normal and ISO logical networks would be allowed or performed (the demonstration network would be logically closed).
Stand-Alone TP-4 Internet Demonstration. The next step would be to expand the demonstration to include more than one network (at least logically) and hence involve gateways. If only TP-4 is involved, this is a simple extension to test TP-4 over longer internet paths with more variable performance. If ISO IP is also being tested at the same time, modification of the gateways involved will also be required as indicated in the next section.
Stand-Alone ISO IP Demonstration. Once TP-4 has been tested, introduction of the ISO IP to replace DOD IP may commence. In addition to simply replacing one IP with the other in hosts and gateways, this will require modification of the gateways to perform ICMP and GGP on top of the ISO IP.
These gateways could either be dedicated to the demonstration and hence have only ISO IP, or could be concurrently supporting normal operational traffic via DOD IP. In the latter case, once again, no forwarding of traffic between ISO demonstration internet and normal systems would be allowed.
At the conclusion of these three steps, the ISO TP-4 and IP could be deemed to have demonstrated their basic functional suitability in a military environment. The transition support equipment described above should have been developed in parallel, providing the capability to smoothly and successfully switch operational systems using the old protocols to use of the new protocols.
Switchover of User Systems
Once the above preparations have been made and the demonstration completed, if Option 2 is being followed, the switchover of user systems can commence. Each network or community within a network should be able to switch at its convenience and maintain the ability to interact with other systems. The user systems will not be required to support operational use of both protocol sets simultaneously at any time unless they wish to do so for their own reliability purposes.
Switchover of user systems also requires a personnel-training effort. While earlier steps involved a relatively small number of specialists and support staff at major sites, this step will affect all user sites, and their network support staff must be trained in the new procedures.
Once switchover of all systems to the new protocol set is complete, support for the old protocols by TACS, service hosts, and gateways can be removed.
Lessons Learned from the ARPANET NCP-to-TCP Transition
The following points summarize some important lessons learned during the ARPANET transition from NCP to TCP (16).
Conversion of TACs and service hosts to support both protocols before the transition of user hosts starts is essential.
Relay capabilities were heavily used for mail, but used little for other purposes.
The Network Information Center was not ready to support the new protocols and this caused problems in distributing the host name table.
There were significant performance problems that required careful analysis and parameter tuning after the transition. These were unavoidable because no service host had been stressed prior to the switchover, with a full user load over a long time period using the new protocols.
(15) For the remainder of this chapter, the use of TCP and TP-4 to include their respective IPs will no longer hold. The four entities--Transmission Control Protocol (TCP) and its Internet Protocol (DOD IP) and the Transport Protocol (TP-4) and its Internetwork Protocol (ISO IP)--will be treated individually.
(16) For additional information, see ARPANET Request for Comments: NCP/TCP Transition Plan, J. Postel, (Menlo Park, California: SRI International Telecommunications Sciences Center, November 1981).