We first present our basic recommendation and then provide detailed recommendations on aspects that require amplification. These are followed by additional considerations in several important areas relating to the transition plans. Many of our recommendations are closely related to each other, and care should be taken not to consider any single recommendation in isolation.

BASIC RECOMMENDATION​

The committee unanimously recommends that DOD should adopt the ISO TP-4 (and IP) as DOD costandards with its TCP (and IP) and move toward eventual exclusive use of TP-4. Transition to use of the ISO standards, however, must be managed to maintain operational capabilities and minimize risks. The timing of the transition to use of these protocols is, therefore, a major concern, and the committee was divided on the best schedule to recommend.

A majority of the committee favored immediate adoption of the ISO protocols as costandards with TCP, giving major procurements in 1984-85 the option of using these standards (Option 1). A minority favored deferring adoption of the ISO protocols by the DOD until after a demonstration of commercial quality implementations supporting military applications (Option 2). This difference is reflected in detailed recommendations 2-4 below. The reasons for the two viewpoints are based on differences within the committee on the extent of the risk associated with adopting a protocol, TP-4, that has not been implemented on operational networks.

DETAILED RECOMMENDATIONS​

In the following recommendations the committee provides details about actions that should be taken to implement the basic recommendations. Most of the recommendations involve actions that require the DOD to take the lead role, with occasional support from the NBS Institute for Computer Sciences and Technology. Some recommendations are directed more toward NBS. Other government agencies and parties interested in using DOD protocols or in their future evolution may also find these recommendations applicable.

(1). DOD should rapidly identify "open areas" of the ISO TP-4 specifications where various options for implementation are allowed and define a required subset for use in DOD systems (a MIL-SPEC version of the standards, for example). In doing this, the DOD should work with the NBS with the goal of developing a Federal Standard, that has relatively few options for implementation, facilitates maximum federal interoperability, and makes it clear to vendors which functions are required in their commercial products.

(2). DOD should aggressively develop and implement a plan for integration of TP-4 as a costandard with TCP and for migration toward its eventual exclusive use. The plan should include provision for rapid completion of a MIL-SPEC (detailed recommendation 1), either validation or demonstration facilities (detailed recommendation 3), timing for procurement of systems with the new protocols (detailed recommendation 4), development of equipment and procedures to support a period of joint operation with both TCP and TP-4 protocols in use, and guidelines for eventual conversion of TCP systems to the new protocols.

Whatever timing is chosen for the introduction of ISO protocols, an extended period must be expected when both TCP and TP-4 are in use in different systems. Hence equipment and procedures must be developed to provide limited communication between systems using the two protocol sets. This will include dual protocol operation for some gateways, relay hosts, service hosts, and terminal concentrators. A secondary purpose of the test system described in detailed recommendation 3 should be to aid in development of this transition support equipment.

Both a general transition strategy and specific transition plans for each existing system should be developed. The switchover from old to new protocols will take place at different times as appropriate for each system during an overall transition period of many years.

(3). As soon as possible, the DOD should develop a protocol test facility. If Option 1 is followed, this facility would serve primarily to validate implementations of both old and new protocol sets. If Option 2 is followed, the facility would initially focus on demonstrating the suitability of the new protocols for use in a military environment as rapidly as possible and then provide for testing of commercially supplied protocol implementations.

For validation purposes, the NBS protocol-testing facility developed for ISO protocols should serve as a good basis, but extensions to deal with any DOD-specific option for the ISO protocols, performance, and DOD protocols would be necessary. DOD is now beginning such a program.

For a more complete demonstration, commercial-quality implementations of the ISO protocols must be obtained and shown to support military applications in an operational subnetwork such as such as ARPANET or DODIIS. In both cases the facility should also be used for development and demonstration of the transition support equipment mentioned in detailed recommendation 2.

(4). Procurements of new networks and major upgrades of existing networks should favor use of ISO TP-4 as rapidly as possible. If Option 1 is followed, RFPs may specify the new protocols immediately. If Option 2 is followed, this must await successful completion of the demonstration discussed in recommendation 3. Procurements for existing networks using TCP may continue to require TCP-based equipment until an appropriate conversion point is reached (see detailed recommendation 2).

The purpose of this recommendation is to minimize spending on new TCP implementations and their subsequent conversion to TP-4 where possible, while recognizing that some additions to TCP-based systems will also be needed. If Option 2 is followed, immediate requirements for new systems may force new implementations of TCP in these cases also because the demonstration is not completed at the time RFPs must be issued.

(5). As part of a transition plan, a transport service interface to higher-level protocols more like that of TP-4 should be developed for TCP and tested with existing higher-layer protocols.

This should serve as a rapid test of whether existing DOD protocols can make effective use of the somewhat different style of service that TP-4 provides. It should also allow higher-level protocols to be modified to make use of TP-4 in parallel with the implementation of TP-4 itself, making the ultimate transition to TP-4 more rapid and certain of success. Finally, it may allow use of a single version of the higher-level protocols to be used on both TCP and TP-4 equipment.

(6). DOD should continue using existing DOD-specific, higher-level protocols for operational purposes (Telnet, FTP, and Simple Mail Transfer Protocol, for example) but minimize effort on their further development and plan to adopt suitable ISO protocols as they are developed. Research on protocols providing new services (multimedia mail, compressed video, and voice store-and-forward, for example) should continue. The committee is pleased to find that DOD is already pursuing this course of action.

(7). The NBS Institute for Computer Sciences and Technology should maintain close liaison with DOD to ensure that DOD needs for new protocols and modifications to existing standards are effectively represented to appropriate standards bodies. This should include research areas such as multimedia mail where there is significant commercial as well as military interest.

The committee is pleased to find that this is already being done through contracts from DOD for ICST to represent its interests in standardization activities. Further cooperation (in demonstrating and testing protocols, for example) could occur.

(8). The NBS and DOD should collaborate from the outset in the development of new protocols for use as federal standards. This will ensure early agreement on functions, features, and services of the protocols under development. The NBS should present the developing work early to the ISO standardization activities to expedite convergence on internationally acceptable standards.

Such collaboration could help ensure that future protocol standards will be developed in a single, coordinated process that results in a single standard accommodating both DOD, other federal agencies, and commercial needs.

(9). DOD and NBS should develop additions to protocol specifications to support preemption of limited resources by high-precedence users. Such capabilities are needed during high-load situations such as might develop during wartime or other crisis situations. They are not yet part of either the TCP or TP-4 specifications or existing implementations. This should be an example of the sort of collaboration mentioned in detailed recommendations 7 and 8.

This is important to avoid possible incompatibilities between different implementations of the same specification as discussed in Section III. It is likely that vendors would welcome guidance on how to deal with open areas of the specifications, and early action by DOD could result in their mandated subset becoming the de facto standard for most commercial implementations as well, with consequent benefits to DOD. This is a good area for cooperation between DOD and NBS.