2. Physical Layer Requirements
The Point-to-Point Protocol is capable of operating across any DTE/DCE interface (e.g., EIA RS-232-C, EIA RS-422, EIA RS-423 and CCITT V.35). The only absolute requirement imposed by PPP is the provision of a full-duplex circuit, either dedicated or circuit-switched, which can operate in either an asynchronous (start/stop) or synchronous bit-serial mode, transparent to PPP Data Link Layer frames. PPP does not impose any restrictions regarding transmission rate, other than those imposed by the particular DTE/DCE interface in use.
PPP does not require any particular synchronous encoding, such as FM, NRZ, or NRZI.
Implementation Note:
NRZ is currently most widely available, and on that basis is recommended as a default. When configuration of the encoding is allowed, NRZI is recommended as an alternative, because of its relative immunity to signal inversion configuration errors.
PPP does not require the use of modem control signals, such as Request To Send (RTS), Clear To Send (CTS), Data Carrier Detect (DCD), and Data Terminal Ready (DTR).
Implementation Note:
When available, using such signals can allow greater functionality and performance. In particular, such signals SHOULD be used to signal the Up and Down events in the Option Negotiation Automaton (described below).