"Architectural" Highlights
As was implied earlier, one of the problems with viewing a reference model prescriptively rather than descriptively is that the articulation of the model must be more precise than appears to be humanly possible. That the ISORM, in striving for superhuman precision, fails to achieve it is not grounds for censure. However, by reaching a degree of apparent precision that has enticed at least some of its readers to attempt to use it in a prescriptive fashion, the ISORM has introduced a number of ambiguities which have been attributed as well to the ARM by relative laymen in intercomputer networking whose initial exposure to the field was the ISORM. Therefore, we conclude this not-very-rigorous paper with a highly informal treatment of various points of confusion stemming from attempting to apply the ISORM to the ARM.
(It should be noted, by the way, that one of the most striking ambiguities about the ISORM is just what role X.25 plays in it: We have been informed by a few ISORMites that X.25 "is" Levels 1-3, and we accepted that as factual until we were told during the review process of the present paper that "that's not what we believe in the U.K." What follows, then, is predicated on the assumption that the earlier reports were probably but not definitely accurate--and if it turns out to be in time to help prevent ISO from embracing X.25 exclusively by pointing out some of the problems entailed, so much the better.)
"Customized Parking Garages"
The typical picture of the ISORM shows what looks like two highrises with what looks like two parking garages between them. (That is, seven layers of protocol per "Data Terminal Equipment", three layers per "Data Circuit Terminating Equipment".) The problem is that only one "style" of parking garage--i.e., one which presents an X.25 interface--is commonly understood to be available to stand beside an ISORM DTE by those who believe that ISO has adopted X.25 as its L1-3. In the ARM, on the other hand, no constraints are levied on the Communications Subnetwork Processors. Thus, satellite communications, "Packet Radios", "Ethernets" and the like are all accommodated by the ARM.
Also, the sort of Outboard Processing Environment mentioned earlier in which networking protocols are interpreted on behalf of the Host in a distributed processing fashion is quite comfortably accommodated by the ARM. This is not to say that one couldn't develop an OPE for/to the ISORM, but rather that doing so does not appear to us to be natural to it, for at least two reasons: 1. The Session Level associates sockets with processes, hence it belongs "inboard". The Presentation Level involves considerable bit-diddling, hence it belongs "outboard". The Presentation Level is, unfortunately, above the Session Level. This seems to indicate that outboard processing wasn't taken into account by the formulators of the ISORM. 2. Although some ISORMites have claimed that "X.25 can be used as a Host-Front End Protocol", it doesn't look like one to us, even if the ability to do end-to-end things via what is nominally the Network interface is somewhat suggestive. (Those who believe that you need a protocol as strong as TCP below X.25 to support the virtual circuit illusion might argue that you've actually outboarded the Host-Host layer, but both the X.25 spec and the ISORM appeal to protocols above X.25 for full L II functionality.) Perhaps, with sufficient ingenuity, one might use X.25 to convey an H-FP, but it seems clear it isn't meant to be one in and of itself.
"Plenty of Roads"
Based upon several pictures presented at conferences and in articles, DCE's in the X.25-based ISORM appear to many to be required to present X.25 interfaces to each other as well as to their DTE's. Metaphorically, the parking garages have single bridges between them. In the ARM, the CSNP-CSNP protocol is explicitly outside the model, thus there can be as many "roads" as needed between the ARM equivalent to ISORM parking garages. This also allays fears about the ability to take advantage of alternate routing in X.25 subnets or in X.75 internets (because both X.25 and X.75 are "hop-by-hop" oriented, and would not seem to allow for alternate routing without revision).
"Multiple Apartments Per Floor"
As noted, the ISORM's strictures on inter-entity communication within each "highrise" are equivalent to having to climb downstairs and then back up to visit another apartment on your own floor. The ARM explicitly expects PI's within a layer to interface directly with one another when appropriate, metaphorically giving the effect of multiple apartments on each floor off a common hallway. (Also, for those who believe the ISORM implies only one protocol/apartment per layer/story, again the ARM is more flexible.)
"Elevators"
The ISORM is widely construed as requiring each layer to be traversed on every transmission (although there are rumors of the forthcoming introduction of "null layers"), giving the effect of having to climb all seven stories' worth of stairs every time you enter the highrise. In the ARM, only Layer I, the Network Interface layer, must be traversed; protocols in Layers II and/or III need not come into play, giving the effect of being able to take an elevator rather than climb the stairs.
"Straight Clotheslines"
Because they appear to have to go down to L3 for their initiation, the ISORM's Session and Transport connections are, to us, metaphorically tangled clotheslines; the ARM's logical connections are straight (and go from the second floor to the second floor without needing a pole that gets in the way of the folks on the third floor--if that doesn't make a weak metaphor totally feeble.)
"Townhouse Styles Available"
Should ISORM Level 6 and 7 protocols eventuate which are desirable, the "two-story townhouse style apartments" they represent can be erected on an ARM L I - L II (Network Interface and Host-Host Layers) "foundation". With some clever carpentry, even ISORM L5 might be cobbled in.
"Manned Customs Sheds"
Although it's straining the architectural metaphor quite hard, one of the unfortunate implications of the ISORM's failure to address operating system integration issues is that the notion of "Expedited Data" exchanges between "peer entities" might only amount to an SST flight to a foreign land where there's no one on duty at the Customs Shed (and the door to the rest of the airport is locked from the other side). By clearly designating the Host-Host (L II) mechanism(s) which are to be used by Layer III (Process-Level/ Applications) protocols to convey "out-of-band signals", the ARM gives the effect of keeping the Customs Sheds manned at all times. (It should be noted, by the way, that we acknowledge the difficulty of addressing system integration issues without biasing the discussion toward particular systems; we feel, however, that not trying to do so is far worse than trying and failing to avoid all parochialism.)
"Ready For Immediate Occupancy"
The ARM protocol suite has been implemented on a number of different operating systems. The ISORM protocol suite "officially" offers at most (and not in the U.K., it should be recalled) only the highly constraining functionality of X.25 as L1-L3; L4-L7 are still in the design and agreement processes, after which they must presumably be subjected to stringent checkout in multiple implementations before becoming useful standards. The metaphorical highrises, then, are years away from being fit for occupancy, even if one is willing to accept the taste of the interior decorators who seem to insist on building in numerous features of dubious utility and making you take fully furnished apartments whether you like it or not; the ARM buildings, on the other hand, offer stoves and refrigerators, but there's plenty of room for your own furniture-- and they're ready for immediate occupancy.