Skip to main content

Implementation Schedule

  • July 18, 1975 -- Done with the basic design. A version of the TIP which has a general version of the option negotiator, but refuses all options, operational.

  • Mid-September, 1975 -- Design of the options done. A version of the TIP which includes any modifications that are necessary to support the options operational.

  • Mid-November -- Operational version of the TIP with the basic set of options implemented (Binary Transmission, Echo, Suppress Go-Ahead, Timing Mark, RCTE).

  • End of 1975 -- Any problems with hosts worked out, any necessary revisions done, and a solid version of the TIP up and running the TELNET Protocol with options.

[ This RFC was put into machine readable form for entry ]
[ into the online RFC archives by Alex McKenzie with ]
[ support from GTE, formerly BBN Corp. 10/99 ]