Skip to main content

V. Procedure

A connection to the UCLA host discard socket was first established using the network communications programs. Every test from this point on required a repetition of the following steps.

  1. Initialize the UCSB IBM 360 for double buffered data transfers using specified buffer sizes.

  2. Initialize the SEL measurement control program with the proper buffer size and process bit-rate.

  3. Start the test. A constant tone from the speaker indicates that the process is being properly maintained. Gaps in the tone indicate gaps in the process.

  4. After 30 seconds, stop the test.

  5. Examine the gap table to determine the number of gaps, the duration of each gap, and the average duration.

The entire procedure was carried out from the SEL end using the interactive On-Line System. The timing interval of 30 seconds was measured with a sweep second hand of a watch and the test was started and stopped manually. All tests were conducted during prime time to obtain typical loading conditions.