Remaining Retrofit Schedule

Listed below is the schedule for the remaining retrofits. We have arranged this schedule to coincide with usual monthly Preventive Maintenance at each site so as to minimize user inconvenience, but the work required will frequently require the machines to be down longer than normal. I will issue additional RFC's updating this schedule as necessary.

Any site which anticipates difficulty with the expansion of TIP size, and thus the floor space requirement, should contact Hawley Rising (BBN) at (617) 491-1850 ext. 473

All dates given below are in the form (month/day)

Utah (2/1)
UCSB (2/6)
Belvoir (2/8)
NOAA (2/12)
USC (2/13)
Stanford (2/14)
ETAC (2/15)
Aberdeen (2/22)
ISI (2/22)
Case (2/26)
CCA (2/28)
SRI (3/7)
Rome (3/14)
FNWC (3/15)
UCLA (3/19)
AMES IMP (3/21)
GWC (3/22)
Carnegie (4/4)
SDC (4/17)
Illinois (4/18)

[ This RFC was put into machine readable form for entry into the online RFC archives by Alex McKenzie with support from GTE, formerly BBN Corp. 9/99 ]