Skip to main content

Introduction

BB&N quarterly report #13 outlines part of the current flow control scheme in the IMP operating system. A meeting held March 16, 1972, at BB&N was devoted to the description of this new scheme for the benefit of interested network participants.

This note represents my understanding of the flow control mechanism. The essential goal is to eliminate unnecessary retransmissions when the load is heavy, eliminate the retransmission time-out period when the load is light, increase bandwidth, prevent re-assembly lock-up, control traffic from HOSTS into the net more strictly than the earlier link blocking method, and secure the rights of life, liberty, and the pursuit of happiness for ourselves and our posterity,...oops.