Planned Hardware Work

For those who are interested, the hardware facility work to be done during this period will include:

  • Removal of the Bryant disk, Bryant disk controller and Cybernex drum-disk interference.
  • Moving the Tasker display system and DEC dispack (old and new) equipment to their new locations.
  • Having Bryant people run a combination drum maintenance and training session to teach ARC people how to change heads and clean the drum.
  • Redoing the power cabling to the drum.
  • Putting the new signal cable in between drum and controller.
  • Debugging the parity checker.
  • Making a check of all main signal levels in XCORE.
  • Debugging the new cable from the parity checker to XCORE.
  • Wiring the parity bit through the Cybernex XCORE interface.
  • Getting any necessary power wiring done.
  • Building a wall for the next dispack location.