Skip to main content

Introduction

NETWORK HOST STATUS

This RFC reports on the status of most Network Hosts from May 22 to June 2.

No testing was done on Memorial Day, which Massachusetts celebrated on May 29. No testing was done on May 31 and June 1 due to an attempt to install the new IMP system.

Three new terminal IMPs were installed during this interval. On June 1, Terminal IMP #155 was installed at Fort Belvoir in Fairfax, Virginia; on June 3, Terminal IMP #154 was installed at SAAC (Seismic Array Analysis Center) in Alexandria, Virginia; and on June 5, Terminal IMP #153 was installed at NOAA (National Oceanic Analysis Agency) in Boulder, Colorado.