4. Setting Directions for the IETF
4.1. The Need For Interim Solutions
Solutions to the problems of advanced Internet layer functionality are far from being well understood. While we should certainly encourage research in these areas, it is premature to start an engineering effort for an Internet layer which would solve not only the scaling problems but also those other issues.
Plus, most approaches to the problem of IP address space exhaustion involve changes to the Internet layer. Such approaches mean changes changes to host software that will require us to face the very difficult transition of a large installed base.
It is therefore not likely that we can (a) develop a single solution for the near-term scaling problems that will (b) also solve the longer-term problems of advanced Internet-layer functionality, that we can (c) choose, implement and deploy before the nearer-term problems of Class B exhaustion or routing table explosion confront us.
This line of reasoning leads to the inevitable conclusion that we will need to make major enhancements to IP in (at least) two stages.
Therefore, we will consider interim measures to deal with Class B address exhaustion and routing table explosion (together), and to deal with IP address exhaustion (separately).
We will also suggest that the possible relation between these nearer- term measures and work toward advanced Internet layer functionality should be made an important consideration.
4.2. The Proposed Phases
The IESG recommends that we divide the overall course of action into several phases. For lack of a better vocabulary, we will term these "immediate", "short-term", mid-term", and "long-term" phases. But, as the ROAD group pointed out, we should start all the phases immediately. We cannot afford to act on these phases consecutively!
In brief, the phases are:
- "Immediate". These are configuration and engineering actions that can take place immediately without protocol design, development, or deployment. There are a number of actions that can begin immediately. Although none of these will solve any of the problems, they can help slow the onset of the problems.
The IESG specifically endorses:
- the need for more conservative address assignment policies, 2) alignment of new address assignment policies with any new aggregation schemes, 3) efforts to reclaim unused Class B addresses, 4) installation of more powerful routers by network operators at key points in the Internet, and 5) careful attention to topology engineering.
-
"Short-term". Actions in this phase are aimed at dealing with Class B exhaustion and routing table explosion. These problems are deemed to be quite pressing and to need solutions well before the IP address exhaustion problem needs to be or could be solved. In this timeframe, changes to hosts can not be considered.
-
"Mid-term". In the mid-term, the issue of IP address exhaustion must be solved. This is the most fundamental problem facing the IP architecture. Depending on the expected timeframe, changes to host software could be considered. Note: whatever approach is taken, it must also deal with the routing table explosion. If it does not, then we will simply be forced to deal with that problem again, but in a larger address space.
-
"Long-term". Taking a broader view, the IESG feels that advanced Internet layer functionality, like QOS support and resource reservation, will be crucial to the long-term success of the Internet architecture.
Therefore, planning for advanced Internet layer functionality should play a key role in our choice of mid-term solutions.
In particular, we need to keep several things in mind:
-
The long-term solution will require replacement and/or extension of the Internet layer. This will be a significant trauma for vendors, operators, and for users. Therefore, it is particularly important that we either minimize the trauma involved in deploying the sort-and mid-term solutions, or we need to assure that the short- and mid-term solutions will provide a smooth transition path for the long-term solutions.
-
The long-term solution will likely require globally unique endpoint identifiers with an hierarchical structure to aid routing. Any effort to define hierarchy and assignment mechanisms for short- or mid-term solutions would, if done well, probably have long-term usefulness, even if the long-term solution uses radically different message formats.
-
To some extent, development and deployment of the interim measures will divert resources away from other important projects, including the development of the long-term solution. This diversion should be carefully considered when choosing which interim measures to pursue.
4.3. A Solution For Routing Table Explosion -- CIDR
The IESG accepted ROAD's endorsement of CIDR [Fuller92]. CIDR solves the routing table explosion problem (for the current IP addressing scheme), makes the Class B exhaustion problem less important, and buys time for the crucial address exhaustion problem.
The IESG felt that other alternatives (e.g., C#, see Solen92) did not provide both routing table aggregation and Class B conservation at comparable effort.
CIDR will require policy changes, protocol specification changes, implementation, and deployment of new router software, but it does not call for changes to host software.
The IESG recommends the following course of action to pursue CIDR in the IETF:
a. Adopt the CIDR model described in Fuller92.
b. Develop a plan for "IP Address Assignment Guidelines".
The IESG considered the creation of an addressing plan to be an operational issue. Therefore, the IESG asked Bernhard Stockman (IESG Operational Requirements Area Co-Director) to lead an effort to develop such a plan. Bernhard Stockman is in a position to bring important international input (Stockman92) into this effort because he is a key player in RIPE and EBONE and he is a co-chair of the Intercontinental Engineering Planning Group (IEPG).
A specific proposal [Gerich92] has now emerged. [Gerich92] incorporates the views of the IETF, RIPE, IEPG, and the Federal Engineering Planning group (FEPG).
c. Pursue CIDR extensions to BGP in the BGP WG.
This activity stated at the San Diego IETF meeting. A new BGP specification, BGP4, incorporating the CIDR extensions, is now available for public comment [Rekhter92a].
d. Form a new WG to consider CIDR-related extensions to IDRP (e.g., specify how run IDRP for IP inter-domain routing).
e. Give careful consideration to how CIDR will be deployed in the Internet.
This includes issues such as how to maintain address aggregation across non-CIDR domains and how CIDR and various IGPs will need to interact. Depending on the status of the combined CIDR activities, the IESG may recommend forming a "CIDR Deployment WG", along the same lines as the current BGP Deployment WG.
4.4. Regarding "Bigger Internet Addresses"
In April-May 1992, the IESG reviewed the various approaches emerging from the ROAD group activities -- e.g., "Simple CLNP" [Callon92a], "IP Encaps" [Hinden92], "CNAT" [Callon92b], and "Nimrod" [Chiappa91].
(Note: These were the only proposals under serious consideration in this time period. Other proposals, namely "The P Internet Protocol (PIP)" [Tsuchiya92b] and "The Simple Internet Protocol (SIP)" [Deering92] have since been proposed. Following the San Diego IETF deliberations in March, "Simple CLNP" evolved into "TCP and UDP with Bigger Addresses (TUBA)", and "IP Encaps" evolved into "IP Address Encapsulation (IPAE)" [Hinden92].)
The "Simple CLNP" approach perhaps initially enjoyed more support than other approaches.
However, the consensus view in the IESG was that the full impact of transition to "Simple CLNP" (or to any of the proposed approaches) had not yet been explored in sufficient detail to make a final recommendation possible at this time.
The feeling in the IESG was that such important issues as
- impact on operational infrastructure,
- impact on current protocols (e.g., checksum computation in TCP and UDP under any new IP-level protocol),
- deployment of new routing protocols,
- assignment of new addresses,
- impact on performance,
- ownership of change control
- effect of supporting new protocols, such as for address resolution,
- effect on network management and security, and
- the costs to network operators and network users who must be trained in the architecture and specifics of any new protocols needed to be explored in more depth before a decision of this magnitude should be made.
At first the question seemed to be one of timing.
At the risk of oversimplifying some very wide ranging discussions, many in the IESG felt that if a decision had to be made immediately, then "Simple CLNP" might be their choice. However, they would feel much more comfortable if more detailed information was part of the decision.
The IESG felt there needed to be an open and thorough evaluation of any proposed new routing and addressing architecture. The Internet community must have a thorough understanding of the impact of changing from the current IP architecture to a new one. The community needs to be confident that we all understand which approach has the most benefits for long-term internet growth and evolution, and the least impact on the current Internet.
The IESG considered what additional information and criteria were needed to choose between alternative approaches. We also considered the time needed for gathering this additional information and the amount of time remaining before it was absolutely imperative to make this decision (i.e., how much time do we have before we are in danger of running out of IP addresses before we could deploy a new architecture?).
This led the IESG to propose a specific set of selection criteria and information, and specific milestones and timetable for the decision.
The next section describes the milestones and timetable for choosing the approach for bigger Internet addresses.
The selection criteria referenced in the milestones are contained in Appendix B.
4.5. Milestones And Timetable For Making a Recommendation for "Bigger Internet Addresses"
In June, the IESG recommended that a call for proposals be made, with initial activities to begin at the July IETF in Boston, and with a strict timetable for reaching a recommendation coming out of the November IETF meeting [Gross92a].
Eventually, the call for proposals was made at the July meeting itself.
A working group will be formed for each proposed approach. The charter of each WG will be to explore the criteria described in Appendix B and to develop a detailed plan for IESG consideration.
The WGs will be asked to submit an Internet-Draft prior to the November 1992 IETF, and to make presentations at the November IETF. The IESG and the IETF will review all submitted proposals and then the IESG will make a recommendation to the IAB following the November 1992 IETF meeting.
Therefore, the milestones and timetable for the IESG to reach a recommendation on bigger Internet addresses are:
July 1992 -- Issue a call for proposals at the Boston IETF meeting to form working groups to explore separate approaches for bigger Internet addresses.
August-November 1992 -- Proposed WGs submit charters, create discussion lists, and begin their deliberations by email and/or face- to-face meetings. Redistribute the IESG recommendation (i.e., this memo). Public review, discussion, and modification as appropriate of the "selection criteria" in Appendix B.
October 1992 -- By the end of October, each WG will be required to submit a written description of the approach and how the criteria are satisfied. This is to insure that these documents are distributed as Internet-Drafts for public review well before the November IETF meeting.
November 1992 -- Each WG will be given an opportunity to present its findings in detail at the November 1992 IETF meeting. Based on the written documents, the presentations, and public discussions (by email and at the IETF), the IESG will forward a recommendation to the IAB after the November IETF meeting.