Funding
In this section, the funding of the IRI is described. Recall that the IRI consists of the infrastructure to connect the agency networks and the services required for users to make effective use of such an infrastructure. These costs are divided into two categories; operations costs and research costs. The operations costs are those to operate and maintain both the communications infrastructure and the user services. These costs must be shared between the various agencies and channeled to the IRIO to operate the IRI. The research costs are those used to carry out the needed research to evolve the IRI. These costs are handled within the various agency budgets and used to support research in each agency with coordination between the agencies.
Operations Cost
Each participating agency will contribute a share of operations cost of IRI. Initially, each agency will contribute an equal share. Later, perhaps, the agency contributions will be adjusted according to a number of factors such as number of users, amount of traffic, type of support required (high bandwidth real time versus low bandwidth mail for example).
To facilitate the funding and administration of the IRI, one agency will be selected to manage the contract with IRIO. All funds will flow through that agency to the IRIO via interagency transfer. The role of the selected agency would be to provide the needed contractual activities and adminstrative management. Technical guidance and monitoring of IRIO activities would be provided by the IRI Policy Board.
It is not yet clear which Federal agency is best for this role. The requirements for such an agency include the ability to deal flexibly with the evolving requirements of the IRI, to deal with funding flowing from the various agencies, and to deal flexibly with the various agency technical representatives and incorporate their recommendations into the contract as required. One of the first activities required for the Policy Board would be to select an appropriate funding agency.
All operations and maintenance funding for the IRI will flow through the IRIO to selected contractors. This allows centralized management of the operation of the IRI.
There are two major assumptions underlying the budgetary estimates to follow. First of all, the IRIO should maintain a fairly low profile with respect to the end users (i.e. the scientists and researchers). That is, the users will interact directly with their local support personnel. The IRIO will act as facilitator and coordinator, and provide facilities, information and help services to the local sites. This will allow the IRIO to remain relatively small, as it will not need to deal directly with the thousands of scientists/users.
Second, it is assumed that the operations budget supports the interconnection of agency networks as well as transit networking where required, but does not include costs of the individual agency networks.
Appendix A provides details of the budgetary estimate. Table 1 gives a summary. Note that the initial year has a higher expenditure of capital equipment, reflecting the need to purchase both the gateways needed for initial interconnection and the needed facilities to provide the operation of the gateways and the user services. Operations costs are expected to grow by inflation while the capital costs should remain constant (decrease when inflation is considered) as the IRI is stabilized.
Research Costs
In addition to the costs of operating and maintaining the communications infrastructure and user services, funding must be allocated to support an ongoing program of research to improve and evolve the IRI.
While each agency funds its own research program, the intent is that the various programs are coordinated through the IRI Policy Board. Likewise, while it is not intended that funds shall be combined or joint funding of projects is required, such joint activity can be done on an individual arrangement basis.
Each agency agrees, as part of the joint IRI activity, to fund an appropriate level of networking research in areas applicable to IRI evolution. The total funding required is currently estimated to be four million dollars in FY87, growing by inflation in the outyears. Details of this budgetary estimate are provided in Appendix A.
+--------------------------------------------------+
| Table 1 |
| |
| Annual IRI Operations Budget |
+----------+-------------+------------+------------+
| Fiscal | Capital | O & M | Total |
| Year | Cost | Cost | |
| | | | |
| | ($M) | ($M) | ($M) |
+----------+-------------+------------+------------+
| 1987 | 2 | 8 | 10 |
+----------+-------------+------------+------------+
| 1988 | 1 | 9 | 10 |
+----------+-------------+------------+------------+
| 1989 | 1 | 10 | 11 |
+--------------------------------------------------+
| 1990 | 1 | 11 | 12 |
+--------------------------------------------------+
| 1991 | 1 | 12 | 13 |
+--------------------------------------------------+