Thursday Morning, February 18
Thursday morning started with the various sites reporting their status. Alex McKenzie of BBN prepared a status form later in the day which was filled out by the representatives of the sites Thursday evening. BBN and NIC will prepare a procedure for keeping this information at the sites and up to date.
Site Status Reports
BBN, TENEX PROJECT: Final stage of incorporating NCP in TENEX. A connection was attempted to Utah, but some bugs were found. The NCP treats the network as a file in a way integral with other types of files. The NCP includes a teletype interface. They hope to incorporate the NCP in SRI's TENEX system by the end of the month.
BBN, NETWORK GROUP: Reported that they were working on three areas:
- Improving the current network
- Working on a 316 version of the IMP and as a Terminal Interface Processor (TIMP)
- Accounting
There are currently 15 IMPs connected to the network. A new software system with minor changes is expected by March.
The TIMP uses the 316. A hardware design exists, but they are still defining the software. A TIMP can handle up to 64 variable speed terminals both sync and async. The first machine is to go to MITRE in September.
BBN emphasized that there are 3 products: a 516 IMP, a 316 IMP, and a 316 TIMP. The 316 IMP is less expensive than the 516 IMP and can connect to one host. BBN is not planning at the moment to exchange 316 IMPs for 516 IMPs. The two are plug-plug compatible.
SDC: In the debug phase for their NCP and expect it up in 4 to 6 weeks. Maybe by 8 weeks their T/S available for network use. Their T/S is a 360/65 running the ADEPT system.
CASE WESTERN RESERVE UNIVERSITY: The IMP has been connected for about one month, but as yet have no NCP. They are planning to use the NCP implemented at Harvard. Case has a PDP-10/50 system. They expect to be up in two to three months.
HARVARD: Harvard has a PDP-1 and PDP-10 connected to the IMP. The NCP for the 10 is in final debugging. The PDP-1 is for refreshing displays. The PDP-10 is for linguistic research and students. Expect to be up in one to two months.
SRI-ARC: SRI has been in the final stage of conversion from an XDS 940 to a PDP-10. They plan to use the BBN TENEX NCP and should be up in three or four weeks.
MIT DYNAMIC MODELING - PDP-10: They expect an NCP to be working by March.
MIT MULTICS: They are connected to the IMP and expect their NCP to be in the final debug stage in four weeks. As Multics is a service machine, they don't have unlimited access and must perform checkout at off hours. They expect to offer regular service to the network in three or four months.
UTAH: PDP-10/50 probably going to be running TENEX in the fall. Their NCP is being written in a higher level language (Euler run interpretively) and are debugging in conjunction with BBN. They have connected to and logged into themselves and expect a debugged version within a month.
LINCOLN LABORATORY, TX-2: They are testing the IMP interface, found errors in Lincoln hardware. Currently, no data errors, but have errors with message IDs. They expect their NCP with logger to be up by April 15. They indicated that for testing purposes, they would like to bring up their IMP without being open to network traffic. BBN says that there is a way to echo to yourself without being open to the network (contact BBN for details).
LINCOLN LABORATORY, 360/97: Running CP/CMS. The IMP interface was completed last month. The NCP and Logger are working. They are planning to put up the NCP as a regular service in April. On request experiments with them can be run sooner.
UCSB: Has had their NCP since October. The NCP runs as independent batch job. They plan to provide service to their On-Line System (a manual is in the NIC collection at each site NIC (5480)). They plan to be on the air morning to evening on a regular basis. There are some interface bugs as indicated earlier.
RAND: 360/65. Their NCP is a user process and can be resident. It requires 8K bytes and does not have a logger.
UCLA, Sigma-7: Their NCP is in final debugging. They expect to be up by March 1 with NCP, logger, and typewriter connection program.
COMPUTER CORPORATION OF AMERICA (CCA): Has just started a project to create a node for the 10-12 bit laser store. They are going to use a PDP-10 as a front end. They are developing a language for data manipulation. The store will also be connected to the B-6500-ILLIAC IV. They are planning data compression as part of their language to ease the problems in use of the network's 50 kilobit line. They are concentrating on security and privacy measures. Initial emphasis will be on shared files. Installation is planned during 1972.
Projects Without Representatives
The following projects did not have representatives at the meeting. Steve Crocker reported on their status.
CMU, PDP-10/50: Their IMP is connected, and they are planning to use the Harvard NCP.
SRI-AI PROJECT, PDP-10: They are planning to run TENEX in the fall.
STANFORD-AI: They are not connected yet, but expect to be on by summer.
NWG Mailing List
The above completed the review of status. Steve Crocker then indicated that the old NWG mailing list was no longer to be used and that the list maintained by the NIC (5731) was the one to be used or that the NIC would handle distribution by sending things through your station agent to them. If your station agent or liaison person should change, please let the NIC know immediately.